- Concrete Delivery: Order proper mix (e.g., 3,000–4,000 PSI) and confirm slump consistency.
- Moistening Base: Lightly dampen base to prevent water absorption from concrete.
- Placement: Pour concrete continuously to avoid cold joints.
- Vibration & Consolidation: Use vibrators to remove air pockets and ensure full contact with reinforcement.
- Screeding: Level the surface with a straightedge to proper elevation.
- Bull Floating: Smooth the surface to embed aggregates just below the top layer.
7. Finishing Operations
- Initial Set Check: Wait until surface moisture sheen disappears (bleed water evaporates).
- Edging & Jointing: Round slab edges and cut control joints to prevent random cracking.
- Troweling: Finish surface to desired texture—steel trowel for smooth, broom finish for traction.
- Surface Protection: Cover slab if wind, heat, or rain conditions threaten curing process.
8. Curing Process
- Curing Method: Use curing compound, plastic sheeting, or wet burlap.
- Maintain Moisture: Keep slab surface damp for at least 7 days for strength development.
- Temperature Monitoring: Protect from rapid drying during curing.
9. Form Removal & Final Work
- Form Removal: Carefully strip forms after initial curing (usually 24–48 hours).
- Edge Repair: Patch any honeycombs or chipped edges.
- Expansion Joints: Install joint filler material between slab sections or adjacent structures.
- Site Cleanup: Remove debris, excess material and clean jobsite.
10. Inspection & Quality Control
- Surface Flatness: Check with straightedge or laser for tolerance compliance.
- Compressive Strength Testing: Use cylinder or core samples as required.
- Crack Inspection: Verify control joints and ensure no excessive cracking.
- Final Approval: Confirm alignment, finish quality and curing results before load application.
Phase Duration Planning & Layout 1–2 days, Site Prep & Formwork 2–3 days, Reinforcement & Inspection1 day, Concrete Pour & Finish1 day Curing Period 7 days (minimum) Final Inspection & Cleanup1 day Total Estimated Duration7–10 days (depending on project size & weather)